MOQ is a category decision before it is a supplier decision. Tooling, carton depth and piece count set the minimum for each game family, which is why chess starts lower than a compendium or a dominoes case. This page sets out the bands, the sample window and the production calendar around them.
All figures are typical and confirmed per model in the quotation. A model that is already stocked can start lower than a model that has to be made; personalisation adds a step rather than a new MOQ, unless a new board or box is involved.
Why MOQ differs by category
| Category | Typical MOQ | Why |
|---|---|---|
| Chess sets | around 100 pcs | standard board and piece set |
| Checkers & draughts | around 50 pcs | simple board and pieces |
| Mancala boards | around 48 pcs | small range, carved board |
| Compendium sets | around 200 pcs | several boards and a bigger box |
| Backgammon sets | around 200 pcs | case, checkers and inlay |
| Cribbage boards | around 200 pcs | drilled board and pegs |
| Dominoes sets | around 300 pcs | tile set and wooden case |
| Ludo & snakes | around 500 pcs | printed board and counters |
| Tic-tac-toe & solitaire | around 500 pcs | low unit value, deep carton |
| Shut-the-box & dice | around 500 pcs | small box and tile set |
| Go, gomoku & xiangqi | around 200 pcs | board and stone count |
The pattern is simple: the more parts a set has and the lower its unit value, the higher the MOQ. A buyer who needs a thin first range should start with chess, checkers and mancala and add the higher-MOQ lines on the second order.
Samples: stock, modified and new
A stock sample usually ships in 3–7 days. A modified sample — a new board print, a different finish, a branded box — takes 7–15 days after artwork is signed off. A new model is a development project with its own tooling and sample round, and it is quoted separately.
The sample round is stated in the quotation, separately from production. A buyer who needs a sample before a trade fair or a seasonal review should ask for it in the first message, because the sample window is the part of the lead time that cannot be compressed.
Production windows
Production lead time is counted from artwork and sample sign-off, not from the order date. Typical windows are around 15–16 days for chess and mancala, around 25 days for checkers, and around 30–35 days for compendiums, backgammon, cribbage, dominoes, go and ludo.
A printed board or an engraved lid adds the approval step to the front of the window. A model that is already stocked may ship in fewer days, and that is stated per model in the quotation.
Ordering around the Chinese New Year break
The factory holiday follows the lunar calendar and falls in late January or early February, with the exact dates changing year to year. Production slows before the break and restarts after it, and shipping capacity is tight on both sides.
Work backwards from the shelf date: allow for production, inland transport to the port, the sailing and the destination clearance, then place the artwork and sample steps before that. A spring shelf date has to be booked before the break, not after it.
MOQ and mixed containers
MOQ is per model, not per container. A first order can combine several models as long as each model meets its own minimum, and a mixed order does not reduce the MOQ of any line.
The container is planned by carton after the model, quantity and MOQ are agreed. A buyer can keep the first order small by choosing fewer models rather than by pushing a single model below its minimum.
What to send to get a firm MOQ
Send the model or category, the quantity per model, the destination market and port, the packaging or personalisation requirement, and the date the goods have to arrive. The quotation then states the MOQ, the sample window, the production lead time and the carton data per model.